AWRA OpsHub Search

What the Delivery Will Post

The storekeeper counts the lorry; the accountant finds out what it cost a week later. A posting preview on the receiving screen shows the journal the delivery will write, line by line and at what price, before anyone presses submit.

Procurement Insights Washingtone Aura 7 min read

The short version

On the screen where a delivery is received against a purchase order, Preview posting shows what approving the receipt will put in the ledger: one balanced journal per line, the account debited and credited, the quantity, the unit cost and where that cost came from. It also lists what goes on inspection hold and what will not be posted at all, with the reason. Nothing is written by the preview. It is built from the same code the approval runs, so the two cannot disagree.

A lorry backs into the yard of a building-materials wholesaler on the Moshi road outside Arusha at half past seven. On it: 400 bags of cement, 120 lengths of 12 mm steel bar, 20 tins of waterproofing compound and six gas cylinders the supplier leaves on consignment. The storekeeper counts, ticks the delivery note, keys the receipt and goes back to the forklift. Nine days later the accountant runs the stock valuation and finds the steel in the books at TZS 0, because the item was created last month with no buying price and the purchase order line was never linked to it. Nobody did anything wrong at the gate. Nobody could see what the gate was about to post.

Receiving is where stock becomes money in the books, and it is usually done by the one person in the business who never looks at a journal. The storekeeper’s job is the count. The cost, the inventory account and the supplier’s side of the entry are decided by rules the storekeeper cannot see, and the first time anyone checks them is month end. By then the error is in the stock value, the cost of every sale since and the gross margin the director has already read.

One button before submit

The receive-against-order screen lists the order’s lines with what was ordered, what has arrived before and what is outstanding. The storekeeper types or scans the quantity that came today, the damaged units, and for tracked items the batch, the serials and anything held for inspection. Beside Submit Delivery sits Preview posting. Press it and a panel opens headed What approval will post, built from the quantities on the screen at that moment. Change a quantity and press it again; nothing has been saved either time.

Line Qty Unit cost (TZS) Cost came from Debit Credit
Cement 50 kg 400 15,000.00 Purchase order price (net of tax) Inventory Accounts payable
Steel bar 12 mm 120 28,000.00 Cost typed on this receipt Inventory Accounts payable
Waterproofing 20 L 20 55,000.00 Purchase order price (net of tax) Inventory Accounts payable
Gas cylinder 13 kg 6 — Not posted: the supplier’s stock — —

That is the Arusha delivery as the preview shows it once the storekeeper has typed the steel price from the supplier’s invoice. Before he typed it, the steel line sat under Not posted with the reason in words: no cost to post, because the order price, the typed cost and the item cost are all zero. The error that took nine days to find is on the screen before the receipt exists.

Where the cost comes from, in order

Every line names the source of its unit cost, because the source is what tells you whether to trust it. The approval looks in a fixed order and the preview reads the same order:

  1. A cost typed on this receipt

    In the currency the receipt names, converted to your base currency. This wins over everything, for the delivery where the invoice price differs from the order.

  2. The purchase order’s agreed price

    Net of any tax included in it, and converted at the order’s own exchange rate where it has one. The cement’s TZS 17,700 inclusive of 18% VAT goes in at TZS 15,000.

  3. The item’s current average cost

    For a line with no order price, so it comes in at what the same stock already costs.

  4. The item’s buying price

    The last resort, and the one most likely to be stale or empty.

VAT is not inventory

An order price that includes VAT is taken net of it, so the 18% the supplier charged lands in input tax when the bill is entered, not in the value of the cement on the shelf. A preview line reading 17,700 per bag would have told the accountant something was wrong with the order before the goods were counted.

Which accounts, and why those

The debit is the inventory account chosen on the receipt, or the default inventory asset account when none is chosen. The credit follows what the goods were received against. Against a purchase order, or anything else with a supplier document behind it, the credit is accounts payable: you owe the supplier from the moment the goods are in. Received as the output of a project, the credit is work in progress. Received with no supplier document at all, it goes to a received-stock clearing account that someone has to clear on purpose. Each line is its own balanced journal, rounded to the cent as the ledger stores it, and keyed to that receipt line so it is posted once.

The Arusha delivery, as it will post

Cement: 400 × TZS 15,000 (order price, net of 18% VAT) TZS 6,000,000.00
Steel bar: 120 × TZS 28,000 (typed on the receipt) TZS 3,360,000.00
Waterproofing: 20 × TZS 55,000 (order price), all 20 held for inspection TZS 1,100,000.00
Gas cylinders: 6 on consignment, moved but not posted TZS 0.00
Debit inventory, credit accounts payable TZS 10,460,000.00

Three journals, one per costed line. The held tins are in the total: they are the business’s stock, only off sale.

Held is still yours; consigned never was

Two lines on that delivery behave differently from the rest, and the preview says how. The waterproofing compound is an item marked for inspection on every receipt, so the whole line lands as inspection pending: counted, valued and on the books, but not offered for sale until somebody releases it. For any other item the storekeeper can type a hold quantity on the line, up to what arrived, with a note such as “check seals and temperature log”. The preview lists every held quantity beside the journal, so the accountant knows the stock value includes goods the shop cannot sell yet.

The gas cylinders are the supplier’s. Stock marked as owned by someone else moves through your warehouse and is counted on your shelves, and never touches your ledger: the preview lists it under Not posted with the owner’s name and the words “it moves, but is never on your books”. That is the line most likely to be valued by mistake in a system that cannot tell the two apart. We wrote about running stock you do not own in Stock You Own and Cannot See.

The storekeeper does not need to understand the journal. He needs to see a zero before he submits it.

At the gate, on a phone

Most receiving does not happen at a desk. The mobile app’s receiving screen carries the same preview card, asking the same question of the same code, so a receiver with a phone in the yard sees the same lines, costs and holds as the clerk on the web. Both need the permission to check stock in; the preview gives nobody a view of costs they could not already post. How the receipt is then matched against the order and the bill is covered in What Is Three-Way Matching?, and the receiving document itself in the goods received note guide.

The straight answer

What AWRA OpsHub does today

  • Preview posting on the receive-against-order screen, on the web and in the mobile app, writing nothing.
  • One balanced journal per line, with the debit and credit accounts, quantity, unit cost and the amount to the cent.
  • The source of every unit cost named: typed on the receipt, the order price net of tax, current average cost or buying price.
  • Accounts chosen by rule: accounts payable against a supplier document, work in progress for a project’s output, a clearing account otherwise.
  • Inspection holds listed beside the journal, whether set on the item or typed on the line.
  • Lines that will not post, with the reason: stock owned by someone else, or a line with no cost anywhere.

More we can add to your workspace

  • The same preview on a direct stock check-in, for goods received with no purchase order behind them. Commission it
  • The supplier’s own currency beside the base amount on each line of a foreign-currency delivery. Commission it
  • A warning when a receipt’s unit cost departs from the item’s average by more than a percentage you set. Commission it
  • The preview kept with the receipt as a record of what the receiver saw when they submitted it. Commission it
  • The bill’s VAT side shown with the receipt’s journal, so the full purchase entry can be read in one place. Commission it

Where we point you to a specialist

  • Which inventory account a product belongs in, and whether a clearing account is right for your business, are decisions for your accountant. The preview shows the effect of the accounts you have chosen; it does not choose them for you.

The cost-departure warning is the one finance teams ask for first, because it catches a mistyped price before it reaches the average cost of every later sale.

More we can add

From a preview to a check at the gate

The preview, the cost sources, the holds and the not-posted list are in place on the web and the app. These are the extensions that turn it into a control.

Cost departure warning

A line flagged when its unit cost is far from what the same stock already costs.

Preview on direct check-ins

The same panel for goods that arrive with no order, where the cost is most often guessed.

Supplier currency beside base

The dollar price from the invoice next to the shillings it will post at.

Three questions for whoever receives your stock

Before you submit a receipt, can you see what it will cost in the books?

What you will probably hear

Finance sorts that out later.

How to read it

Then a zero-cost line is found at month end, after it has been sold at a margin that never existed.

Which price does a received line use when the invoice differs from the order?

What you will probably hear

Whatever the system picks.

How to read it

Ask for the order it looks in, and whether each line says which source it used.

Is the supplier’s consignment stock in our inventory value?

What you will probably hear

It is on the shelf, so yes.

How to read it

Goods you do not own should move and be counted without ever reaching your ledger.

See purchase orders and receiving

Receive against the order, hold for inspection, and see what the receipt will post before you submit it.

Explore receiving

Frequently asked questions

Does pressing Preview posting save the receipt?

No. The preview builds the journal from the quantities on the screen and writes nothing. The ledger is posted only when the receipt is submitted and approved.

Which unit cost does a received line use?

A cost typed on the receipt first, then the purchase order price net of any included tax, then the item’s current average cost, then its buying price. The preview names the source on every line.

Which account is credited when goods are received against a purchase order?

Accounts payable, because a supplier document stands behind the receipt. Goods received as a project’s output credit work in progress, and goods with no supplier document go to a received-stock clearing account.

Are goods on inspection hold included in the stock value?

Yes. Held goods are yours and are posted to inventory; they are only kept off sale until released. The preview lists the held quantities beside the journal.

What happens to consignment stock on a receipt?

It moves into your warehouse and is counted, but it is never posted to your ledger. The preview lists it as not posted, with the owner’s name.

Share this article

LinkedIn X WhatsApp

How to do it in AWRA

Step-by-step instructions for what this post describes, in the help centre.

Help Center

Need a quick answer while you read?

Run inventory, procurement, assets, sales, and field work with approved AWRA guidance for setup, migration, integrations, security, pricing, and support.

Search all approved AWRA public help articles.

Open Help Center